Air Liquide, Rodeo, CA
Hydrogen Plant Construction and Vessel Fabrication
For this project, PMI provided a complete mechanical construction service package, including vessel fabrication. We installed 42 pipe rack modules, a steam turbine, vessels, compressors, a steam methane reformer, a penthouse, and inconel alloy tubes.
Owner:
Air Liquide
Engineer:
CB&I
Duration:
12 months
Total Direct Man-Hours:
160,000