Keahole, Kailua-Kona, Hawaii
PMI completed the installation of two heat recovery steam generators (HRSGs), one steam turbine and generator, one ACC Unit, and all associated piping, valves, pumps, and tanks.
This project also included the detailing and fabrication of large and small bore piping at the PMI Los Angles pipe fabrication shop.
Owner:
Hawaiian Electric Light Company
Engineer:
Black & Veatch
Duration:
13 months
Total Direct Man-Hours:
127,150